+44 (0)161 284 4100

Call our technical sales team

Mabledon PlaceLondon, UK

Overview

Once the home of the trade union UNISON, the 1970s commercial block, One Mabledon Place, is currently undergoing major refurbishment. McLaren is carrying out considerable structural works to the basement and ground floor, reconfiguring upper floors and altering the original façade.

The extensive refurbishment works includes major structural alterations to the basement and ground floor, with the existing structural core being removed in its entirety and replaced. New lift cores are to be constructed from the basement to level four and up to level six, and there will be extensive roof level works and reconfiguration of the upper floors.

Client :
Stanhope

Architect :
Bennetts Associates

Contractor :
McLaren Construction

Sectors :
Offices

Our Package

Finished in stainless steel, AccentHansen supplied almost 30 Glazeshield FL doorsets rated for 30 to 60 mins fire integrity. The doorsets were configured as doubles, single and singles with side panels.